Only what is ready
You plan elements that work preparation has released. Deviating is only possible with approval and a reason.
PRODUCTION PLANNING
The production foreman spreads the released elements over the production tables, per day or per week. On the shop floor people start, pause and finish their elements, with the production drawing at hand. So you always see what is done, what is running late and how full the tables are. Part of the Production add-on for 99 euro per month per production line.
TABLES AND DAY PLANNING
Create your own production tables, with hall, table type, maximum sizes, capacity per working day, working days and the people who work at them. The day planning shows the released elements without a spot on the left and the tables side by side on the right. Drag an element onto a table or plan several at once.
WEEK AND CAPACITY
The week planning puts all tables and days side by side; a click on a day opens that day to move things around. Capacity & occupancy shows per table and per day how much time there is, how much is planned and how much has actually been worked, per week or per month.
PROGRESS ON THE SHOP FLOOR
In Production progress everyone sees per table the elements of today, plus what is not yet finished from earlier. With big buttons you start, pause and finish an element; Beamcore keeps track of the time worked. The detail panel shows the production drawing per zone, the instructions from work preparation and the comments.
PRODUCTION PROPOSAL
With Optimise planning Beamcore proposes days and tables, working back from the latest date an element has to be ready. The proposal takes pinned elements, table type and size, capacity, dependencies between elements and times from your own actual hours per m² into account. Nothing changes until you accept the proposal.
BAR PLANNING PER TABLE
The bar planning shows 2, 4, 6 or 8 weeks with one row per table. Drag an element to another day or table; the colour shows the status and a bar per day the occupancy.
GANTT AND PLAN EVERYTHING
Production planning opens on the Gantt planning, with larger bars and a fixed colour per project. An element that does not fit after all can be dragged back to Still to be planned. For each table you see how full it is, per day and per period.
MATERIAL AND DELAYS
With the Timber stock add-on, the Gantt shows for each production part whether the material is ready on time, late or not yet covered. If material is not on time, you get a notification every working day at 07:30.
WHY IT WORKS
You plan elements that work preparation has released. Deviating is only possible with approval and a reason.
A new version of the model does not throw the planning away: an element keeps its table and day.
Starting, pausing and finishing gives the actual time per element.
With Wkb & quality assurance you see on the card which checks are still open.